About Us
Our History
The Ossipee Corner Fire Department is located at 105 Old Route 28 and currently has 14 Members. The Department operates under the Ossipee Corner Light and Power Precinct. The Department responds to Fires, Motor Vehicle Accidents, Medical Aids, HAZMAT Incidents, and Search and Rescue Calls over 38 square miles of the Town, which is approximately 48% of the Town. There are two other Precincts that cover the remaining 52% of Town. Effective May 20, 2002 the Town officially dissolved the Town’s Rescue Squad. At that point the individual Fire Departments began responding to the Medical Aid Calls in their Precinct with the Towns contracted Ambulance Service.
The Station was originally built in the late 1950’s and consisted of two bays. Later an addition was built on the rear for an office/multipurpose room and bathroom. In the 1980’s a third bay was added. In the late 1980’s or early 1990’s a hose tower was built and two additional small cold storage bays were added. After all the additions, the Station currently has three bays in front, two smaller cold storage bays in back, a hose tower, a bathroom, and a room in the rear of the bays that is utilized for meetings, classes, kitchen and office. Currently all three primary response vehicles have to be custom built to fit into the station and there is no room to expand on the property. Several reports have been done on the current station. The first was back in 1999, reporting that the building was marginally adequate. This was before the department started responding to Medical Calls. The second was in 2006 reporting that the station has outlived its usefulness as a fire station for a number of reasons. A few of the major reasons are as follows: no room for further expansion, space is needed for a shower, decontamination area, gear washing, training, storage of files and supplies. The station is essentially bursting with every inch of space being used. A shower is needed for decontamination after calls. Gear washing after calls has to be done at other Departments. The multipurpose room has had to have computers and file cabinets added as things have evolved over the years and does not have room to meet all of its original intended use. The stove can no longer be used. The room is not sufficient to hold trainings in anymore so a truck has to be pulled out and a bay is used. A Land Committee was formed and in 2007 after an extensive search, land was purchased for a new station just down the road from the current station behind the Town YMCA Field. In 2009 the Town hired MRI to do a study on merging the Fire Precincts. MRI not only reported that this station should be a top priority to replace, but that there would need to be additional sub stations in the future in this Precinct. In 2011 an attempt was made to build a new station for $1,850,000 with an estimated tax impact at that time of 72 cents per thousand in assessed value, but it failed with most opinions reporting too costly for the Precinct’s Tax Base. In 2012 the Town sent out a survey for a second time to see if the Town Residents recommended keeping the Precincts or merging them. Both times the Town Residents overwhelmingly recommended to keep the Precinct’s as is. In 2012 a new Building Committee was formed, they looked at 11 additional pieces of land and in the end determined that the one the Precinct purchased in 2007 was the best piece to move forward with for a number of reasons. A geotechnical site evaluation was completed in 2013 and concluded that the site proposed was more than adequate to build a fire station on. In 2014 the site was logged and stumped to have the site ready in case a grant could be found to assist in the construction of the building. Previous grants were available before the land was purchased, but a requirement was that the site had to be shovel ready to build. By the time the land was purchased these grants were no longer available. We are continuing to look for ways to offset the cost of this project. Unfortunately, the cost continues to increase every year.
The Department originally solely ran on Volunteers. In today’s world most of the Members are working two if not three jobs. Because of this, over the years the Department has transitioned from volunteer to paid on call. Due to the lack of members available during the week days the Department now staffs the station Monday – Friday during the day. With the call volume and responsibilities of the job increasing, staffing is more and more difficult. Nationwide since COVID, Departments are struggling with retention for a number of reasons, including burn out. Recruitment is becoming more difficult as well. The number of people entering this career are fewer and fewer making it more difficult to find applicants and fill open positions. Departments are now competing with each other to fill their open positions. This problem is Nationwide.
